Monitoring

Measuring is the step that everyone skips

Wireless meters at site, room, and pitch level. Quick to install, no digging required, and data from day one.

On the existing DIN-railWireless, no digging requiredData from day one
Step 1 of 3

Without measurement, everything afterwards is an assumption

Measuring is the dullest step and the only one you can't skip. Everything that follows — insight, savings, recharging — is built on it.

One meter for a hundred places

What you measure at one point cannot be assigned anywhere. Any conclusion afterwards is a distribution key, not a measurement.

Data that arrives too late

A reading per year is a result. To manage you need a trend, not a final score.

Afraid of the renovation

Most companies postpone measuring because they expect digging work. That's exactly what doesn't happen.

There's more to measure than you think

Most companies are aware of electricity, gas, and water. That's usually where it ends, while other measurements catch the faults.

Temperature in a freezer or a boiler, air quality in a workplace, the fill level of a container, the number of people entering a building: all sensors, all on the same dashboard.

You don't need to do everything at once. One field or one building is enough to see what it yields.

There's more to measure than you think
What you get

What will be installed on your site

No project with a construction fence around it. A half-day of work per row.

Meters in your existing cabinet

On the DIN-rail, in the field cabinet or meter cabinet that is already there.

Wirelessly connected

No trenches through the field and no new wiring to the reception.

Data from day one

As soon as it's installed, it counts. You don't have to wait for the next billing period.

Expandable per row

Start with one field or one building and grow with what it generates.

The meters in brief

DIN-rail
fits in the existing cabinet
Calibrated
you may charge a guest on it
Wireless
no wiring and no digging
Remotely switchable
turn electricity on or off per site
Within 24 hours, we received the first report of a malfunction that we would never have otherwise discovered.

Camping de Wildhoeve - Emst

What is needed to make it work

One gateway on the site captures all sensors, up to over a kilometer away. This means one cabinet is sufficient for an entire park, even if the meters are far apart.

The sensors are energy-efficient: most last more than five years on a single battery. This makes a sensor in a pit or a technical room usable.

Everything that comes in is stored, so you can compare this season with last season without having to archive anything yourself.

What is needed to make it work
Next step

Curious about what can be measured on your site?

We’ll visit, see what’s in place, and calculate what it could yield.